Shuwaikh Port
Shuwaikh port is the main commercial port in the State of Kuwait. It is located to the immediate North and East of Kuwait City. Shuwaikh navigation channel is about 8 Kms long.The port has 21 berths including 2 container berths.
Vessels sailing to and from the port pass through a Navigation Channel dredged inside Kuwait Bay. The channel is about eight kms long and its depth is maintained at 8.5 M at minimum water tide level. The port can receive vessels of 7.5 M draft at Zero tide and vessels of upto 9.5 M draft at High tide.
Port Location
Latitude : 29 Deg 21.30 N
Longitude : 47 Deg 55.54 E
Admiralty Chart : 1214
Admiralty Pilot : 63
Time Zone : GMT + (Plus) 3 Hrs
Port security Level : 1 (One)
Draft Restriction
- Channel Low Point minimum draft - 7.0 M
- Add 7.0 M to figure quoted from Tide Table as High or Low Water
- Result will be Maximum Available Water
- Water Density 1.025
-
Maximum ARRIVAL DRAFT should not Exceed 9.50 M Due to Draft limitations in channel
Shuwaikh Port control to be notified on VHF channel 16, about 4 hours prior vessel and also when passing the following :
-
Ahmadi Racon (35 N Miles approx From Pilot station)
Position Lat 28 Deg 21.5N, Long 48 Deg 53.0E -
Abeam Ras Al Ard
Position Lat 29 Deg 21.5N, Long 48 Deg 08.5E - 3 Miles to Pilot station
Pilot Boarding about 1 Mile from Entrance (Ras Ajuzah)
- Lat 29 Deg 25.6N, Long 47 Deg 59.6E
Anchorage Position
- Lat 29 Deg 25.0n, Long 47 Deg 58.7E subject to Port permission
- Approx 18 M / Muddy
Pilotage
24 Hours Pilotage available except during shift timing 0600 – 0900 approx every day.
Contact Harbour Control on Channel 16 / 11
Details of Berths
|
Berth Nos |
A/S Draft in M |
Max L.O.A in M |
Estimated Commodity wise |
|
1 |
9.60 |
186 |
Grain |
|
2 |
9.60 |
180 |
Lube oil/Gen Cgo |
|
3 |
9.60 |
180 |
Lube oil/Gen Cgo |
|
4 |
9.60 |
180 |
Gen Cargo |
|
5 |
9.60 |
180 |
Ro/Ro or Gen Cargo |
|
6 |
9.60 |
180 |
Gen Cargo |
|
7 |
9.60 |
180 |
Gen Cargo |
|
8 |
9.60 |
210 |
Cement in Bulk |
|
9 |
9.60 |
200 |
Lay by (current) |
|
10 |
9.60 |
200 |
2 Quay crane under construction |
|
11 |
9.60 |
200 |
Self Geared Containers |
|
12 |
9.60 |
180 |
2 Quay crane under construction |
|
13 |
9.60 |
200 |
2 Quay crane to construct upon completion of B #12 |
|
14 |
9.60 |
200 |
Container/Gen Cargo |
|
15 |
6.00 |
185 |
Gen Cargo/Dft restricted |
|
16 |
6.00 |
140 |
Passenger |
|
17 |
6.00 |
200 |
Gen Cargo/Dft restricted |
|
18 |
8.00 |
185 |
Ro/Ro & Containers |
|
19 |
8.00 |
200 |
Reefers / Gen Cargo |
|
20 |
8.00 |
200 |
Reefers / Gen Cargo |
|
21 |
8.00 |
200 |
Live stock / Gen Cargo |
It is important to note that both ports/customs work individual and no interport transportation permitted. i.e. containers discharged in each port has to be cleared with Kuwait Customs Individually.
Note : Vessel must be self sustained on all General Cargo vessels. Port does not have shore crane facility. If shore mobile crane assistance required, same to be arranged well ahead to avoid delays.
For more information please visit : www.kpa.com.kw
Projects (2010-2011)
Al Rashed awarded with ISO 9001:2008 certification
ISO 9001:2008 Certification